US Navy Gets Future USNS Fall River JHVS

  • Our Bureau
  • 09:40 AM, September 17, 2014
  • 3116

The US Navy accepted delivery of Joint High Speed Vessel, the future USNS Fall River from the Austal USA shipbuilder. 

 

The delivery marks a major milestone, the official transfer of the vessel from the shipbuilder to the Navy. USNS Fall River is the U.S. Navy's fourth Joint High Speed Vessel (JHSV).

 

"Today the Navy received a tremendous asset," said Strategic and Theater Sealift Program Manager Capt. Henry Stevens. "The addition of Fall River to the fleet will enhance our forward presence and ability to bolster global security from the sea by quickly transporting significant resources to a wide array of geographic regions throughout the world in time of need." 

 

Joint High Speed Vessels are versatile, non-combatant transport ships built from a commercial design with limited modifications for military use. These ships enable the fast, intra-theater transport of troops, military vehicles and equipment. Each JHSV is capable of transporting 600 short tons 1,200 nautical miles at an average speed of 35 knots.

 

The unique characteristics of JHSVs include a versatile off-load ramp and flight deck for helicopter operations. This further enhances port access and the Navy's operations in littoral areas. 

The USNS Fall River has a core crew of 22 civilian mariners who operate and navigate the ship as part of the U.S. Navy's Military Sealift Command. The ship is designed to be used in support of a variety of different missions. 

 

As one of the Defense Department's largest acquisition organizations, PEO Ships is responsible for executing the development and procurement of all destroyers, amphibious ships, special mission and support ships, and special warfare craft. Delivering high-quality war fighting assets - while balancing affordability and capability - is key to supporting the Navy's Maritime Strategy.

 

Also Read

Austal Wins $124.9 Million High Speed Support Vessels Contract

March 10, 2014 @ 04:04 PM

Austal Successfully Complete JHSV USNS Millinocket's Trail

January 15, 2014 @ 02:51 PM

Austal and Lockheed Martin Wins $1.4Bn to Build two additional LCS...

March 19, 2012 @ 12:00 AM
FEATURES/INTERVIEWS
© 2024 DefenseMirror.com - ALL RIGHTS RESERVED