Keel Laid for Indian Navy’s Third Project 17A Stealth Frigate

  • Our Bureau
  • 06:06 PM, September 10, 2020
  • 3482
Keel Laid for Indian Navy’s Third Project 17A Stealth Frigate
INS Nilgiri

Keel of the third ship (Yard- 12653) of the Indian Navy P17A class stealth frigates was laid on 10 Sep 2020.

The keel laying ceremony was conducted through an e-platform in the presence of Vice Admiral R B Pandit, Chief of Staff, HQWNC and Vice Admiral Narayan Prasad  CMD of  MDL Shipyard, an Indian MoD release  said.

Seven frigates under P17A series will be constructed of which four are being constructed in MDL and three in GRSE Shipyard with MDL as the lead yard. The P17A class frigates are being built using indigenously developed steel and fitted with weapons and sensors along with Integrated Platform Management System. These ships are having stealth features.

Construction of P17A ships differ in the very concept of warship building by way of adoption of the modern technology ‘Integrated Construction (IC)’ where the blocks are pre-outfitted before joining to reduce the build period of warships. When commissioned, the platforms will enhance the combat capability of the Indian Naval fleet.

Also Read

India Launches ‘INS Nilgiri’ Stealth Frigate

September 28, 2019 @ 05:54 AM

DCNS India delivers to Mazagon Dock Limited (MDL) the first locally...

February 28, 2012 @ 12:00 AM

DCNS to help accelerate submarine production in Indian shipyard MDL

December 8, 2010 @ 12:00 AM
FEATURES/INTERVIEWS