U.S. Navy Accepts New Ship-to-Shore Connector Vessel

  • Our Bureau
  • 12:23 PM, June 5, 2021
  • 3549
U.S. Navy Accepts New Ship-to-Shore Connector Vessel
Landing Craft Air Cushion (LCAC) 101 @Textron

The U.S. Navy accepted delivery of the next generation landing craft, Ship to Shore Connector (SSC), Landing Craft, Air Cushion (LCAC) 102, earlier this week.

Delivery follows successful completion of Acceptance Trials with the Navy’s Board of Inspection and Survey to test the readiness and capability of the craft and to validate requirements.

LCACs are built with similar configurations, dimensions, and clearances to legacy LCAC, ensuring the compatibility of this next-generation air cushion vehicle with existing well deck equipped amphibious ships, as well as the Expeditionary Transfer Dock.

The SSC program is now in serial production with LCACs 103-115 making progress on the production lines at Textron Systems in Slidell, Louisiana.  

SSC training craft, LCACs 100 and 101 are in the initial operator training pipeline and are in post-delivery test and trials at Naval Surface Warfare Center Panama City Division.

As one of the Defense Department's largest acquisition organizations, PEO Ships is responsible for executing the development and procurement of all destroyers, amphibious ships, special mission and support ships, boats and craft.

Also Read

Damen Shipyards Lays Keel for Dutch Navy Combat Support Ship, Den Helder

June 4, 2021 @ 08:39 AM

Iranian Navy Ship Carrying 7 Fast Attack Boats Heading to Venezuela

June 2, 2021 @ 11:29 AM

Iranian Navy’s Training & Logistics Vessel Sinks after Fire in Gulf of...

June 2, 2021 @ 08:43 AM
FEATURES/INTERVIEWS
© 2024 DefenseMirror.com - ALL RIGHTS RESERVED