Honeywell International, was awarded a $255,076,495 contract to provide parts and support for the overhaul of 1,000 SAGT (Automotive Gas Turbines) 1500 engines or equivalents per year for Program year 4 (PY4) and the potential Program Year 5 (PY5) of the Total InteGrated Engine Revitalization (TIGER) program in support of Abrams tank production, Abrams derivative vehicles and Army stock spares. The engine equivalents will support the Anniston Army Depot (ANAD) turbine value stream (TVS) AGT 1500 engine overhaul line. This action is required as soon as possible but no later than the end of the 3rd quarter fiscal year 2009 to ensure a continuous flow of engines through the engine overhaul line to meet the tank production line requirements at the Joint Systems Manufacturing Center (JSMC) and to meet field spare requirements. The TIGER program is an Army initiative to revitalize the Automotive Gas Turbine (AGT) 1500 (horsepower) engine fleet which supports the Abrams tank and derivation vehicles (M1A1 tank, M1A2 tank and the Heavy Assault Bridge (HAB)). The TIGER program will increase the reliability of the AGT 1500 engine by improving the overhaul processes to a "near" new engine standard, including durability based design improvements and will provide the support to Anniston Army Depot (ANAD) for the overhaul of up to 1000 each AGT 1500 engine equivalent per year. This approach will foster a long-term partnership between PM Heavy Brigade Combat Team (configuration management), TACOM Heavy Combat Products Support Integration Directorate (forecasting oversight), Anniston Army Depot (ANAD) (depot facilities, workforce, warranty support) and Honeywell Int'l (technical support, overhaul process expertise, demand management, supply chain management, inventory control and field service/ warranty support).