Damen Starts Constructing First F126 Frigate for German Navy

German F126 project involves construction of four F126 frigates, with an option for two additional vessels
  • Defensemirror.com bureau
  • 12:02 PM, December 6, 2023
  • 928
Damen Starts Constructing First F126 Frigate for German Navy
F126 frigate

Damen Shipyards and project partner NVL Group marked the commencement of the construction phase for the German F126 frigates by cutting the first steel at the Peene shipyard in Wolgast on December 5.

Initiated in June 2020, the F126 project involves the construction of four F126 frigates, with an option for two additional vessels.

The F126 frigates, with a length of 166 meters and a displacement of up to 10,000 tonnes, will be the largest in the German naval fleet. Designed as versatile multi-mission platforms, these frigates can operate globally in various conditions, from tropical climates to polar regions.

The construction of the F126 frigates involves collaboration with various partners, including Lockheed Martin for MK 41 Vertical Launching Systems, Hensoldt and Thales for TRS-4D naval radar, and Rheinmetall for MLG27-4.0 defence systems.

The delivery of the first ship is scheduled for 2028.

Also Read

Rheinmetall’s Next Gen MLG27-4.0 Gun Systems Chosen for German F126 frigates...

November 17, 2022 @ 08:09 AM

Rolls-Royce's mtu NautIQ Master Integrated Platform Management System for German F126 Frigates

January 28, 2022 @ 06:11 AM

Damen, DNV Sign Classification & Verification Contract for Germany’s Upcoming F126 Frigates

June 22, 2021 @ 09:54 AM

Damen Shipyards, Hamburg Ship Model Basin to Conduct Hydrodynamic Tests on Models...

April 27, 2021 @ 05:24 AM
FEATURES/INTERVIEWS
© 2024 DefenseMirror.com - ALL RIGHTS RESERVED