Production rate of the JF-17 combat jet has been ramped up with China and Pakistan managing to reduce production period of each jet by 15 days. A report published by China Aviation News affiliated with state-owned AVIC company today stated: “Production line of the JF-17 has on average shortened the production period of a single aircraft by 15 days compared to last year
Chinas J-20B stealth fighter has entered mass production after receiving thrust vector controls, and with better maneuverability, it has made its way to the list of fifth-generation fighter jets. “The moment was marked at a ceremonial unveiling of the modified J-20B jet on July 8
The U.S
The New Zealand Army will place an order for 43 Bushmaster NZ5.5 armored vehicles manufactured by Thales Australia
BAE Systems has opted for the CAE Medallion MR e-series visual systems for the Eurofighter Typhoon full-mission simulators the former is building for the Qatar Emiri Air Force. “We are excited by their selection of the Medallion MR e-Series to support the synthetic training capability for the Qatar Emiri Air Force,” stated Thibaut Trancart, Managing Director, Defence & Security -- Middle East, CAE at the CAE OneWorld virtual conference and tradeshow on July 8
MBDA and 13 partners will adapt the Missile Moyenne Portée (MMP) man-portable missile system to possess beyond-line-of-sight (BLOS) attack capability. “
China has completed construction of last of 120 bridges planned in its nearly 430km railway project linking Lhasa and Nyingchi in the Tibet Autonomous Region (TAR) on Saturday. The 525
Boeing delivered the first two F/A-18 Block III Super Hornets to the U.S
Leonardo has signed a twenty-year framework agreement with the Danish Defence Acquisition and Logistics Organisation (DALO) which provides for logistics support and the possible future upgrade of the seventeen 76/62 Super Rapid Gun Mounts which are in-service on the Danish Navys Iver Huitfeldt Class Frigates, Thetis Class Inspection Ships and Knud Rasmussen Class Inspection Ships. The agreement is worth up to a total value of 70 million Euros and can be extended in line with the needs of DALO and future budgets
Production of 50,000 AK103 assault rifles in Armenia is scheduled to begin in July in this year. The relevant contract for the organization of the phased manufacture of AK-103 in Armenia was signed based on the decision of the Russian Federal Service for Military- Technical Cooperation (FSMTC) on May 15, 2020