GE9X engine achieves FAA certification

  • Our Bureau
  • 02:19 PM, September 28, 2020
  • 2471
GE9X engine achieves FAA certification

GE Aviation announced today that its GE9X engine has been certified by the U.S. Federal Aviation Administration (FAA) authorities, a key milestone in its journey to power the new twin-engine Boeing 777X family.

The FAR (Federal Aviation Regulation) Part 33 certification involved eight test engines. This certification achievement culminates GE Aviation’s renewal of its commercial jet engine portfolio, including the GEnx for the Boeing 787 Dreamliner and the CFM LEAP engine.

The GE9X test engines completed just less than 5,000 hours and 8,000 cycles for certification.

The GE9X engine is designed to achieve 10 percent lower specific fuel consumption (SFC) compared to the GE90-115B and five percent better SFC than any other engine in its class. The engine will also operate with less smog-causing emissions than any other engine in its class.

 “This milestone has been accomplished thanks to the tremendous efforts of the GE9X team and our partners,” said Karl Sheldon, GE9X program general manager. “The GE9X engine has been through a rigorous and thorough certification and testing process. We are pleased with the performance of the engine, which has been validated through extensive ground and flight testing.”

GE’s working with Boeing to complete the 777X flight test program and entry into service. Eight GE9X test engines and two test spares have been produced and delivered to Seattle for Boeing’s four 777X test airplanes. Several GE9X production engines have been assembled, and GE Aviation is in the process of completing factory acceptance tests.

GE Aviation is currently conducting 3,000 cycles of additional ground testing on the GE9X engine to support Extended Operations (ETOPS) approval. The GE9X team is also conducting maturation testing to help GE engineers prepare to support the engine in service.

For service and support of its customers, GE has established GE9X engine training courses at its Customer Technical Education Center (CTEC) facility in Cincinnati. A GE9X engine currently at CTEC is being used to develop lean maintenance practices that will be implemented in customer training modules and GE training procedures. Course work includes line maintenance, borescope and boroblend repair procedures, as well as fan stator removal and installation. The CTEC team is also working augmented reality/virtual reality (AR/VR) training courses to supplement the in-person training.

GE has received orders and commitments for more than 600 GE9X engines.

IHI Corporation, Safran Aircraft Engines, Safran Aero Boosters and MTU Aero Engines AG are participants in the GE9X engine program.

CFM is a 50/50 joint venture between GE Aviation and Safran Aircraft Engines.

Also Read

China Eastern Airlines to Equip Boeing 737 Fleet with Thales DO-260B-Compliant Transponders

September 25, 2020 @ 08:27 AM

Boeing Awarded $2.2 Billion for Small Diameter Bomb

September 25, 2020 @ 04:16 AM

Boeing, GA-EMS, Aerojet Team to Bid for MDA’s Next Generation Interceptor Project...

September 24, 2020 @ 03:18 PM

Boeing Designs Ultravoilet Wand to Sanitize Aircraft Interiors

September 22, 2020 @ 01:44 PM
FEATURES/INTERVIEWS