L-3 Communications announced today that its L-3 Unidyne division has been awarded two firm-fixed-price contracts valued at $52 million to execute the U.S
The first two modernized Super Puma helicopter were handed over to the Swiss Air Force today. The transport aircraft is well-proven and is currently undergoing a major modernization program to upgrade its electronics, which date back to the 1980s, to a level comparable to the Cougar transport helicopter also operated by the Air Force
Lockheed Martin Corp has been awarded a $39,300,000 not-to-exceed modification to a previously awarded cost-plus-award-fee contract to update the design, verification, and test of the Joint Strike Fighter (JSF) Partner Version Air System development under the JSF Delta System Development and Demonstration Program. Work will be performed at Fort Worth, Texas, and is expected to be completed in October 2014
Raytheon Co., Missile Systems, Tucson, Ariz
Indian Company BEML Limited has awarded Polish Company Bumar with a $275 million contract for the supply of 204 WZT-3 Armoured Recovery Vehicles. The contract was signed by both companies on January 17, 2012
L-3 Link Simulation & Training (L-3 Link) announced today that it has been awarded a contract by the Naval Air Warfare Center Training Systems Division to build an F/A-18D Tactical Operational Flight Trainer (TOFT) for the Royal Malaysian Air Force (RMAF). The F/A-18D TOFT is scheduled for delivery during the first quarter of 2014 to an RMAF base in Butterworth, Malaysia
Northrop Grumman Corporation has been awarded a $334 million firm-fixed-price contract from the U.S
The Boeing Co., Mesa, Ariz
The Indian Ministry of Defense is all set to give the Air Force a “new look” by phasing out MiG 21s which have been involved in frequent crashes and inducting a modern next-gen aircrafts. "MiG 21s which constitute around 40 per cent of the IAF fleet will start getting phased out from 2014
The Pakistani Air Force has received its first batch of three F-16 Block 15 MLU (Mid Life Upgrade) aircraft from Ankara, Turkey. The aircraft were earlier sent to TAI (Turkish Aerospace Industries) for Mid Life Upgrade and have been delivered to PAF on time