Babcock, in partnership with ST Engineering, introduced the 120mm Ground Deployed Advanced Mortar System (GDAMS), a vehicle-mounted, hinged mortar system designed to enhance the capabilities of the UK Armed Forces. The system was presented at the Defence Vehicle Dynamics (DVD) 2024 in the UK
The Azerbaijani Army has announced the arrival of the first unit of the DITA 155mm self-propelled howitzer, part of a broader order for 70 systems from the Czech Republic-based Excalibur Army. This initial delivery was confirmed ahead of the Azerbaijan ADEX International Defense Fair, scheduled to take place from September 24...
The U.S
Saab Inc., New York was awarded a $494,350,000 contract for an unspecified numberof XM919 Individual Assault Munition (IAM) systems
Ruselectronics of Russia is demonstrating a portable artillery and mortar battery control system at the Army 2024 event in Moscow which besides the compact size replaces wired data transmission a special Wi-Fi channel. The new development allows automated control of any artillery and mortar systems, both domestic and foreign, including heterogeneous groups and using the entire range of ammunition
Russia is set to unveil an all-new remotely controlled 122mm D-30 Self Propelled howitzer gun at the Army 2024 arms fair near Moscow starting August 12. The self-propelled gun can be remotely controlled up to a distance of about 500m and is based on 122 mm D-30 gun on the MTS-15 tracked chassis
Elbit Systems won a contract worth approximately $270 million to supply rocket artillery to an international customer. The contract will be performed over a period of 4 years
The U.S
Russias Rostec said it has shipped another batch of 2S43 Malva 152mm self-propelled artillery guns to the troops. This is the first domestic wheeled howitzer created on the BAZ chassis with the 8x8 formula
The Spanish Army has signed a framework agreement with Rheinmetall to supply approximately half a million modular propellant systems for 155mm extended-range artillery ammunition. The deal, worth up to €205 million, is scheduled for delivery between mid-2024 and the end of 2025